Write the decision before the result
Build a journal that records assumptions rather than excuses.
Updated 2026-11-15 · Educational, not financial advice · AI-assisted editorialA useful plan can say “skip”
A plan records the instrument, observation window, exact condition, invalidation, size assumptions, costs and circumstances that prevent action. If a condition cannot be measured, describe it honestly as discretionary. Do not rewrite the condition after seeing the outcome.
Separate decision quality from profit
An individual profitable result does not prove a sound process, and a losing result does not by itself invalidate one. Record whether the stated conditions actually occurred, whether execution matched the plan and whether an error changed the outcome.
Review in comparable units
R-multiples compare outcomes with an explicitly defined initial modeled risk. Win rate alone ignores loss size and costs. Expected value estimates average wins and losses under the sample’s assumptions; a small or selected sample can be badly misleading. Keep screenshots, timestamps and actual costs together. This site’s browser tools are not a broker-connected account ledger.
Put a number to it.
A hypothetical rule wins 40% of the time, averaging +2R on wins and −1R on losses. Before costs, its sample expectancy is 0.4 × 2 − 0.6 × 1 = +0.2R. Different costs, tail losses or a changed market can erase that estimate.
Try this without placing a trade.
Write one paper-trade entry with a timestamp, skip condition and cost estimate. Afterward, grade whether the plan was followed separately from whether the outcome was positive.
Self-reported study progress, not a qualification. Marks last in this tab’s session. Remembering them across visits is optional and stays in this browser.
Check the source. Keep exploring.
The linked references support the concepts; they do not endorse this course or its illustrative examples.
CFTC: forex education and fraud awareness ↗Risk/reward planning workspace →Risk before position size guide →